alibris logo

Increasing Aircraft Carrier Forward Presence: Changing the Length of the Maintenance Cycle

by , ,

The U.S. Navy1s aircraft carrier fleet must meet the forward presence requirements of theater commanders. With a decreasing fleet size, planners must balance the timing of maintenance, training, and deployment with presence and surge demands. Evaluating multiple one- and two-deployment scenarios per cycle, RAND examines the feasibility of different cycle lengths, their effect on carrier forward presence, and their impact on shipyard workloads.

loading
  • Book Details
  • Seller
Increasing Aircraft Carrier Forward Presence: Changing the Length of the Maintenance Cycle
2008, RAND Corporation

ISBN-13: 9780833044075

Trade paperback

Filter Results
Shipping
Item Condition
Seller Rating
Other Options
Change Currency